Udhampur Srinagar Baramulla Rail Line Project
Undertook the work at various important places which include Tunnel 5, Station Building Salal ,bridge 43, bridge 44 AKA Chenab Bridge, Tunnel 6, Tunnel 9,Tunnel 10,Tunnel 11,Tunnel 12,Station Building dugga,Tunnel 13 the works accomplished are as under-
1. Installation of hot dip galvanised Ladder type tray on chenab bridge includes laying of all type of signalling and telecommunication cables, installation of all type of signals on Chenab bridge.
2. We complete all outdoor works for signalling and telecommunications at above mentioned locations which includes installation of
a. Box type cable trays.
b. Laying of power,quard 10amp, optic fiber, duct pipes, signalling cables.
3. We Installed all the earthing equipments which includes
a. Boring of 3 m earth electrode.
b. Interconnection inside the niches.
c. Diffrent type of chambers .
d. Exothermic joints.
e. Earthing tapes.
f. Earthing grid stations outside portals.
4. Installations of GI pipes inside escape tunnels, Laying of quard, optic fiber, duct pipes.
5. Installation of Location Box,Signal, Advance Starter,Home Signal,Distant Signal,Junction Box,DB Box. Installation involves foundation as well as wiring work.
6. Indoor work of S & T inside station building Salal and station building Dugga.